Gold Member Since 2011
Audited Supplier
QingDao Tome International Co., Ltd.

Stair Railing, Glass Railing, Railing Systems manufacturer / supplier in China, offering Stainless Steel Stair Railing, Glass Railing, 90 Square Degree Glass Clamp- Fastener Type, Adjustable Top Straight 180 Degree Handrail Support Tube-Tube-Round Type and so on.

(/ )

Supplier Homepage Product Bar Holder Stainless Steel Stair Railing, Glass Railing

Stainless Steel Stair Railing, Glass Railing

FOB Price: Get Latest Price
Min. Order: 100 Pieces
Production Capacity: 10, 000 PCS/Month
Transport Package: Cartons and Pallets or as Per Customers′ Request
Payment Terms: L/C, T/T, D/P, Paypal, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: Handrail Fittings
  • Function: Non-slip, Decoration
  • Stair Railing / Handrail: Stainless Steel
  • Stair Tread: Stainless Steel
  • Type: Straight Stairs
  • Trademark: Tome
  • HS Code: 73089090
  • Customized: Customized
  • Style: Pastoral, Simplicity, Classic, Modern, European, Chinese
  • Baluster: Stainless Steel
  • Material: Stainless Steel
  • Usage: Indoor, Outdoor
  • Origin: China
Product Description
Stainless Steel Stair Railing, Glass Railing:

1) Material: AISI304, AISI316

2) Surface treatment: Satin or mirror finish

3) Size: Flat, 33.7mm, 42.4mm, 48.3mm tube and for 10mm, 12mm, 14mm rod

4) Packing: Cartons and pallets or as per requests

5). Delivery time: 10-35 days

6). Payment terms: T/T 30% deposit, 70% balance payment

7). OEM is available



FAQ
Q1.Where is your factory?
In Qingdao,City.
Q2.What material do you have?
SS304//SS316
Q3.Can you provide sample for us?
Yes, free sample is available
Q4. How do you ensure quality control?
We have our own Quality Department and we will make sure the quality for our all the items.
Q5.How do you ship the goods to us?
We have the forwarder cooperated with us for many years, they can deliver the goods to you in very short time with competitive price. And also, you can ship by your own agent as your convinence.
Q6. Can you offer the customize handrails for us?
Yes, we can, our engineer will check your project drawings to make sure its accuracy for each different fittings and quantity.
Q7. How about your delivery time ?
Usually, it need cost about 20 days for rigging hardware, 25 days for the tubes, 30-35 days for handrail fittings.

Q8.how about your payment terms?
 T/T,L/C,D/P.
Q9. What height you can do for the balustrdes?
970mm, 1050mm, 1180mm, 1330mm for all the styles of balustrades,and we can offer the height as you need
Q10.Can you do the balustrades according to our design?
Yes, you just need to offer the drawing.



Send your message to this supplier
Avatar
Mr. Evan Xu
Sales Manager
*From:
To: Mr. Evan Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category